Walers and Struts

A simple to assemble two-sided, hydraulic bracing system designed for use with steel trench sheets to horizontally brace small trenches for the safe installation of utilities. The complete system can support trench widths of 0.6m to 6.0m and is normally installed using an excavator.

  • A range of waler lengths and weights available to suit the application, including aluminium walers
  • Struts are connected to the waler via a pin and retaining clip, or connected via clamps

Technical Specification

WALER

Description Waler Weight (kg) Length (mm) Width (mm) Max Length Between Struts (mm) Sheet to Sheet Width Range (mm)
Medium Duty 70 2000 83 1420 565-3800
Medium Duty 88 2500 83 1920 565-3800
Medium Duty 97 3000 83 2420 565-3800
Medium Duty 112 3500 93 2920 565-3800
Medium Duty 129 4000 93 3420 565-3800
Medium Duty 180 5000 116 4370 565-3800
Heavy Duty 100 3000 108 2420 565-3800
Heavy Duty 133 4000 108 3420 565-3800
Heavy Duty 166 5000 108 4420 565-3800
152UC 205 5000 162 4540 950-6000
152UC 385 6000 186 5540 975-6000

STRUTS

Type Length (mm) Weight (kg)
Min Max
550 (A) 550 900 13
800 (C) 800 1400 18
Extension 1 250 N/A 5
Extension 2 500 N/A 10
Extension 3 1000 N/A 20
For more information download the Walers and Struts Technical File
Download Now

3D Tour

Walers-and-Struts-340[/tab][tab id=2]
For more information download the MGF Walers and Struts file
mgf download arrow Walers and Struts Download Now

How can MGF Support your project?

Call now and speak to one of our team

01942 402 700


Top Service for 650 House-Build Development

One of the largest new housing developments in Crewe prepared for the construction of the storm water wet well, penstock chamber and associated pipework, requiring a trusted supplier for the temporary works.
The developers’ site required a 11m x 7.6m excavation to a depth of 9m to provide a safe working environment to facilitate the construction of the permanent works.
Despite being up against a competitor, MGF were the preferred supplier for McPhillips and secured the work based on quality ...

On: 9 Jan, 2019 By: MGF

5 Design Engineers Achieve EngTech MICE

Congratulations to five members of our Engineering Department who have passed their Professional Technician Review.
Adrian Brown, Charlie Stockley, Chris Atherton, Marcin Dardzinski and Matthew Howarth passed the final stage of qualifications to receive their EngTech status with the Engineering council and MICE accreditations from the Institution of Civil Engineers (ICE), therefore gaining the letters EngTech MICE after their names.
Achieving EngTech status with the ICE proves the ability of the candidate at applying proven engineering techniques and procedures to ...

On: 20 Dec, 2018 By: MGF

MGF Achieve GOLD with the Supply Chain Sustainability School

We are delighted to announce that MGF have achieved Gold membership status with the Supply Chain Sustainability School (SCSS).
SCSS aim to lead the construction industry into a more sustainable future through training, events and collaboration between major contractors and suppliers. Their vision is to deliver “world class collaboration, enabling a sustainable built environment” through their values of being “collaborative, progressive, inspirational and inclusive”.
MGF first joined the school in 2012 with the aim of further understanding our industry’s challenges ...

On: 19 Dec, 2018 By: MGF

New Products Added to the Hire Fleet

Two new products have been introduced to the safety equipment fleet and are now available for hire.
MGF have introduced the new Vetter industrial Lifting Bag range and the Hs 2.4S 110V Water Pump system to their ever-expanding safety fleet.
Vetter Lifting Bags
The 8bar (116psi) Lifting Bags are quiet, bump-free and easy to use when lifting heavy loads in tight spaces. The bags lift, press, compress and brace even in angled positions.
A range of sizes and lifting capabilities are available ...

On: 13 Dec, 2018 By: MGF

Register for Updates

Register your email address now to receive updates on all MGF products.

The GRiPSHORE™ Vertishore rails from MGF allowed us to achieve a comprehensive temporary works design that met with the specific site requirements, whilst also reducing manual handling risks, speeding up installation times & reducing the cost of the temporary works equipment

- James West, Project Manager, R&M Utility and Civil Engineering