King Posts and Panels

An ideal solution for single-sided retaining walls or basement type excavations where it is not feasible to drive sheet piles or where a clear working area is essential to allow construction of the works.

KEY PRODUCT FEATURES

  • Retained heights of up to 4m
  • Compatible with MGF Endsafe and trench box panels giving standard panel widths from 1.8m to 3.5m
  • Consists of steel column posts with steel in-fill panels

Technical Specification

 

Panel (L x H) (mm) Panel Thickness (mm) Weight (kg) Panel SWL (kN/m²) Required King Post Centres, Cp (m)
3000 x 2010 Base 60  435 / 586 45 3.1
3000 x 1100 Top 60 320 45 3.1
3500 x 2462 Base 100 970 50 3.6
3500 x 1624 Top 100 686 50 3.6
1800 x 1200 Endsafe 60 225 45 1.9
2400 x 1200 Endsafe 60 290 45 2.5
2400 x 1800 Endsafe 60 410 45 2.5
3000 x 2000 Endsafe 60 510 45 3.1
2400 x 2400 Endsafe 60 380 45 2.5
4000 x 2000 Endsafe 100 845 45 4.1

3D Tour

King Post 340 x 340[/tab][tab id=2]

How can MGF Support your project?

Call now and speak to one of our team

01942 402 700


MGF Launch T700 Brace

MGF is delighted to introduce the industry’s strongest modular hydraulic bracing system – the T700 Brace.
To improve our current product offering and to enable larger, clear spans than previously achievable, our Research and Development team and our Major Projects team worked together to develop a new stronger bracing system. As tanks are getting bigger and excavations getting deeper, the requirement for such a system was increasing.
The new T700 Brace System is fully compatible with existing MGF heavy ...

On: 11 Mar, 2019 By: MGF

Celebrating National Apprenticeship Week

This week is National Apprenticeship Week, the annual celebration of the impact of apprenticeships on individuals, employers and the economy.
To ‘make great futures’ happen, we need a talented team of people who are aligned through our shared values and our shared aspiration to build long term relationships with our customers and engage them fully in order to meet and exceed their expectations.
To celebrate the impact of apprenticeships on individuals we asked a few of our apprentices what their ...

On: 7 Mar, 2019 By: MGF

MGF Score 100% in Achilles Audit

MGF are delighted to announce that for the fourth consecutive year, we have achieved 100% in all categories of the Achilles Verify Audit.
The UVDB Verify Audit provides high level, pre-qualification assurance for buyers in the utility sector to assess supply chains before the tender process. It demonstrates a company’s capabilities, credibility and recognition in the marketplace – a ‘passport to trade’ within the sector.
Management Systems Coordinator, Niall Rooney, commented:
“Congratulations and thanks to all involved in continually ...

On: 25 Jan, 2019 By: MGF

Top Service for 650 House-Build Development

One of the largest new housing developments in Crewe prepared for the construction of the storm water wet well, penstock chamber and associated pipework, requiring a trusted supplier for the temporary works.
The developers’ site required a 11m x 7.6m excavation to a depth of 9m to provide a safe working environment to facilitate the construction of the permanent works.
Despite being up against a competitor, MGF were the preferred supplier for McPhillips and secured the work based on quality ...

On: 9 Jan, 2019 By: MGF

Register for Updates

Register your email address now to receive updates on all MGF products.

New technology to de-risk a common high-risk process, using a 3D printer to create models of equipment for training before work moves on to site is a strong advantage.

- Award Panel , Ground Engineering Awards 2014

Accreditations

By continuing to use the site, you agree to the use of cookies. more information

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close