High Clearance Trench Box

Two-sided mechanical high clearance trench box support ideal for installing large diameter pipes and tanks in trench widths of up to 5.4m wide and 5.0m deep.

  • Designed to be installed by a minimum 40t excavator using either dig and push or lower in place techniques
  • Generally suitable for pipe min. lengths of up to 6.0m and a pipe outside diameter (OD) of up to 3.0m

Technical Specification

Description (L x H) (m)Max Depth (m)Panel Thickness (mm)Approx. Assembled Weight (kg)Internal Trench Width (m)Min. Length between Struts (m)Max. Clearance below Strut (m)
7.0 x 3.0 Base5.01509720 – 113502.1 – 5.15.73.0
7.0 x 2.0 Top2.01504826 – 53732.1 – 5.16.20.8
For more information download the High Clearance Trench Box Technical File
Download Now

Video Guide

For more information download the MGF High Clearance Trench Box file
mgf download arrow High Clearance Trench Box Download Now

How can MGF Support your project?

Call now and speak to one of our team

01942 402 700


Coronavirus (COVID-19) Response Statement


The health and wellbeing of our employees, customers, suppliers and the general public continues to be our highest priority.



Adopting a responsible approach, we are now increasing our operational presence as the construction industry continues to resume to higher levels of activity. The distribution of our products and services is running smoothly across our network of depots to ensure our customers are provided with safe working environments with our usual level of service. We have worked ...

On: 1 Jul, 2020 By: MGF

Mickey rallies to support the local community (NHS Volunteer Responders)










Our very own Fleet Manager, Michael (Mickey) Ashcroft recently signed up to the NHS Volunteer Responder scheme along with a phenomenal 600,000 other people from across the UK to support the NHS and their local communities.



Mickey, who lives in Leigh and is still working full-time supporting the business is now a Community Responder Volunteer. He signed up to the scheme as he wanted to support the most ...

On: 7 May, 2020 By: MGF

Video: How do you implement construction site closures with temporary works?


How do you implement construction site closures with temporary works?



In this video, Marketing Manager, Stephen Baldwin interviews Steve Hesketh, MGF Director and member of the board on the Temporary Works Forum (TWf) discussing the considerations and recommendations published within the TWf Information Sheet 11.



An insightful interview for anyone who is currently dealing with site closures.












On: 24 Apr, 2020 By: MGF

MGF ACHIEVE 7TH ROSPA GOLD






We are thrilled to announce that for the 7th consecutive year we have been awarded gold with RoSPA. This achievement marks our 2nd Gold Medal Award after a succession of five Gold Awards.



Our entire business philosophy is grounded on creating safe working environments and ensuring that everyone gets home safe at the end of the day. Our SHEQ team works closely with departments around the business to develop and roll out ...

On: 9 Apr, 2020 By: MGF

Register for Updates

Register your email address now to receive updates on all MGF products.

Organisations that gain recognition for their health and safety management systems such as MGF Trench Construction, contribute to a collective raising of the bar for other organisations to aspire to.

- David Rawlins, RoSPA

Accreditations

Blue and gold RoSPA award logo on white background
White background with blue RISQS logo
Blue RISQS audit logo on white background
CE-mark
Constructionline
ISOQAR
UVDB-AUDITED
UVDB-QUALIFIED
TWF
HSE-strategy
Rail-Alliance-Member-Logo
CPA
LEEA certification logo
Logo for SCSS

By continuing to use the site, you agree to the use of cookies. more information

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close