400 Series Strut

A highly versatile, heavy duty modular bracing strut system designed primarily for use with MGF hydraulic bracing systems, but can also be used in other applications. The complete system can support loads of up to 3500kN and span from 1.6m to 24.5mm.

  • For use with 1250kN, 2500kN double acting hydraulic strut or 3500kN hydraulic strut
  • Operating range from 1.6m to 24.5m
  • Compatible with MGF 305 UC, 406 UC and T700 brace systems

Technical Specification

Face to Face Dimensions (m)1250kN Hydraulic2500kN Hydraulic
Length (mm)Leg Weight (kg)Length (mm)Leg Weight (kg)
MinMaxMinMax
3253633361357274535452026
4353643361552374545452221
5453653361744474555452412
6553663361936574565452605
7653673362130674575452799
8753683362320774585452989
9853693362512874595453181
1095361033628229745105453491
111053611336301710745115453686
121153612336320911745125453878
131253613336340512745135454074
141353614336360013745145454269
151453615336397914745155454648
161553616336398415745165454653
171653617336417816745175454847
181753618336436817745185455037
191853619336456018745195455229
201953620336487519745205455544
212053621336506720745215455736
222153622336526121745225455930
232253623336544222745235456111
242353624336582823745245456497
For more information download the MGF 400 Series Strut Technical File
Download Now

How can MGF Support your project?

Call now and speak to one of our team

01942 402 700


MGF employee Laura Rigby on what World Quality Day means to her



World Quality Day (WQD) is dedicated to raising awareness to the important contributions quality makes towards ensuring business and products success. MGF’s Quality Coordinator, Laura Rigby,  excels in delivering her passion and talent for quality, constantly working to overcome and take challenges in her stride.




Laura began working in Quality over 3 years ago after studying Law at Sheffield Hallam University with the aspiration of becoming a solicitor, however after spending time at United ...

On: 11 Nov, 2020 By: MGF

Coronavirus (COVID-19) Response Statement


The health and wellbeing of our employees, customers, suppliers and the general public continues to be our highest priority



Adopting a responsible approach across all elements of the business, we are working hard to ensure full operational capability in support of the construction industry, as it continues to remain a key industry sector throughout the Covid-19 lockdown. The distribution of our products and services continues to run smoothly across our network of depots to ensure our ...

On: 4 Nov, 2020 By: MGF

Livingston, an update: Meet the Team who are facing the temporary works challenges in Scotland


After almost a year in action, MGF’s Livingston Depot has been providing excavation safety solutions to those across Scotland.



Ideally located in the central belt, MGF’s depot is able to support the growing needs of the northern UK construction industry by offering national service to Scotland with the support of the other 12 MGF locations.



Cairns Gibson, Regional Manager for Scotland and North East England commented: “It’s great to now have a full ...

On: 30 Oct, 2020 By: MGF

MGF upgrade all designs with an Autodesk Revit 3D drawing


Over recent years the industry has begun to embrace the various digital innovations with a view to improving the design/build process.



As a supplier, MGF’s response to this was to transform all their drawing output from 2D AutoCAD to 3D Revit.  By embracing this technology, we can ensure our customers reap the various benefits Revit offers such as:



– Clearer visibility of the scheme



– Auto scheduling of equipment specified
On: 30 Oct, 2020 By: MGF

Register for Updates

Register your email address now to receive updates on all MGF products.

The GRiPSHORE™ Vertishore rails from MGF allowed us to achieve a comprehensive temporary works design that met with the specific site requirements, whilst also reducing manual handling risks, speeding up installation times & reducing the cost of the temporary works equipment

- James West, Project Manager, R&M Utility and Civil Engineering

Accreditations

Blue and gold RoSPA award logo on white background
White background with blue RISQS logo
Blue RISQS audit logo on white background
CE-mark
Constructionline
ISOQAR
UVDB-AUDITED
UVDB-QUALIFIED
TWF
HSE-strategy
Rail-Alliance-Member-Logo
CPA
LEEA certification logo
Logo for SCSS

By continuing to use the site, you agree to the use of cookies. more information

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close