254 UC Brace

This medium to heavy-duty hydraulic bracing system is both simple to assemble and highly versatile. Designed to brace medium to large cofferdams and trenches, allowing safe installation of large underground structures, deeper drive/thrust pits or basements.

  • Larger sizes possible when combined with MGF 200 and 300 series bracing struts
  • Double acting hydraulic power pack combines with a range of fixed length extensions to form the leg brace

Technical Specification

 

Sheet to Sheet Dimensions (m)Assembled Leg Range (mm)Weight (kg)
MinMax
325693573508
435694573684
545695573798
655696573911
7656975731018
8756985731125
9856995731239
109569105731346
1110569115731459
1211569125731642
1312569135731679
For more information download the MGF 254 UC Brace Technical File
Download Now

How can MGF Support your project?

Call now and speak to one of our team

01942 402 700


MGF Employees Deliver Virtual Training Sessions For Students


For the past 5 years MGF have delivered a training module on excavation which focuses on temporary works, this has historically been delivered in person at The College of East Anglia, however this year Anglian Water has extended the initiative into three additional colleges from across the region exposing up to 60 students to the module. The excavation module forms part of the Construction – Level 2 (Extended Certificate) qualification and is taken by a wide variety of students looking ...

On: 4 Aug, 2020 By: MGF

Coronavirus (COVID-19) Response Statement


The health and wellbeing of our employees, customers, suppliers and the general public continues to be our highest priority.



Adopting a responsible approach, we are now increasing our operational presence as the construction industry continues to resume to higher levels of activity. The distribution of our products and services is running smoothly across our network of depots to ensure our customers are provided with safe working environments with our usual level of service. We have worked ...

On: 1 Jul, 2020 By: MGF

Mickey rallies to support the local community (NHS Volunteer Responders)










Our very own Fleet Manager, Michael (Mickey) Ashcroft recently signed up to the NHS Volunteer Responder scheme along with a phenomenal 600,000 other people from across the UK to support the NHS and their local communities.



Mickey, who lives in Leigh and is still working full-time supporting the business is now a Community Responder Volunteer. He signed up to the scheme as he wanted to support the most ...

On: 7 May, 2020 By: MGF

Video: How do you implement construction site closures with temporary works?


How do you implement construction site closures with temporary works?



In this video, Marketing Manager, Stephen Baldwin interviews Steve Hesketh, MGF Director and member of the board on the Temporary Works Forum (TWf) discussing the considerations and recommendations published within the TWf Information Sheet 11.



An insightful interview for anyone who is currently dealing with site closures.












On: 24 Apr, 2020 By: MGF

Register for Updates

Register your email address now to receive updates on all MGF products.

MGF’s 3D computer modelling enabled us to convey the concept and construction methods that were envisaged, which provided a higher level of confidence in the equipment and thus eased the approvals process.

- Chris Thomas, Director, Volker Ground Engineer

Accreditations

Blue and gold RoSPA award logo on white background
White background with blue RISQS logo
Blue RISQS audit logo on white background
CE-mark
Constructionline
ISOQAR
UVDB-AUDITED
UVDB-QUALIFIED
TWF
HSE-strategy
Rail-Alliance-Member-Logo
CPA
LEEA certification logo
Logo for SCSS

By continuing to use the site, you agree to the use of cookies. more information

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close