Edgesafe

A lightweight edge protection system, manufactured from steel and designed to provide perimeter edge protection to an excavation. Designed to be installed by two people this system is available with various panel lengths for flexibility.

  • Complies with BS EN 13374(2013) Class A temporary edge protection systems
  • Compatible with MGF box systems, steel trench sheets and sheet piles
  • Integrated kick board
  • Various Edgesafe connecting brackets available to allow connection to the full range of MGF products

Technical Specification

Description

Length

(mm)

Weight

(kg)

500 Edgesafe Panel

500

7

1000 Edgesafe Panel

1000

12

2000 Edgesafe Panel

2000

22

2500 Edgesafe Panel

2500

27

3000 Edgesafe Panel

3000

31

3500 Edgesafe Panel

3500

37

For more information download the MGF Edgesafe Technical File
Download Now

How can MGF Support your project?

Call now and speak to one of our team

01942 402 700


New Culvert Puller Rated 10/10

“The set up was quick and simple, a team from MGF came out to site to show us how to use it however the operating instructions and system itself were very straight forward.”
Two new versions of Culvert Pullers have been added to the national fleet and are now available for hire. A Safe System of Work animation has been produced to demonstrate the step-by-step method, available to view on the MGF Youtube channel. The new units are quicker and ...

On: 10 Oct, 2018 By: MGF

North West Depot Open Day

An open day hosted at the North West – Astley Depot celebrated the improvements made at MGF’s first operational yard. Customers and colleagues explored the new facilities and enjoyed food, cake and football darts to mark the milestone occasion.
Every week the Astley Depot processes over 100 deliveries and collections and facilitates 600-800 tonnes of kit, making it MGF’s busiest depot in the country.
Brendan O’Hara, Commercial Director said, “I’m delighted to reveal the developments that have been made as ...

On: 28 Sep, 2018 By: MGF

Help from the industry for the industry

Thousands of construction workers are killed, injured or have their health damaged every year in the UK due to unsafe work practices. MGF first joined the Working Well Together (WWT) construction industry health and safety initiative in 2012 and continue to support it today and help stop this suffering.
The Working Well Together (WWT) campaign was set up in 1998 by the Construction Industry Advisory Committee (CONIAC) after recognising the construction industry itself needed to do more to improve its ...

On: 14 Sep, 2018 By: MGF

£50,000 raised for WaterAid

Over the past 15 months, MGF’s Technical Sales Representative Graham Denton has been working alongside 11 other volunteers to raise money and awareness for WaterAid.
Business4Life (B4L) is a scheme hosted by Wessex Water where a team of people who work within the water industry, run various events to raise money for WaterAid. Alongside MGF, this year’s team comprised of employees from Wessex Water, Nomenca and Interserve.
Following in the footsteps of MGF employees of past B4L teams, Graham Denton ...

On: 5 Sep, 2018 By: MGF

Register for Updates

Register your email address now to receive updates on all MGF products.

Organisations that gain recognition for their health and safety management systems such as MGF Trench Construction, contribute to a collective raising of the bar for other organisations to aspire to.

- David Rawlins, RoSPA

Accreditations

By continuing to use the site, you agree to the use of cookies. more information

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close