Vetter Blank Pipe Stopper

Vetter Blank Pipe Stoppers are the optimum solution when quick and reliable sealing of drainage is required. The extensive range of sizes allows reliable pipe sealing for pipe diameters between 75mm to 2000mm. Inflation is via a hand pump or compressor adapter fitted with a pressure regulator. The maximum operating pressure of 1.5 bar (21psi), enables some stoppers to withstand a back pressure of 0.5 bar (7psi or 5m head) when suitably braced.

KEY PRODUCT FEATURES

  • Durable construction expandable pipe stopper
  • Rapid and reliable pipe sealing
  • Pipe internal diameters from 75mm to 2000mm
  • Maximum inflation and back pressure must not be exceeded

£153.00£1,428.00 ex. VAT

Clear

Technical Specification

Range

Max Inflation Pressure

(bar)

Pipe Diameter

(mm)

Diameter Approx

(mm)

Cylinder Length

(mm)

Total Length

(mm)

Air requirement Approx

(litres)

Weight

(kg)

Max Back Pressure

(bar)

Inside Pipeline

Outside Pipeline

100/200

2.5

0.5

100-200

90

510

555

 40

1.2

 1.0

150/300

2.5

0.5

150-300

 145

460

505

 87

1.9

1.0

200/400

2.5

0.5

200-400

 195

650

700

224

2.8

 1.0

200/500

2.5

0.5

200-500

 195

750

 795

 329

5.0

1.0

300/600

2.5

0.5

300-600

 295

735

 780

 507

 7.0

 1.0

500/800

2.5

0.5

500-800

450

1110

 1155

 2135

17.0

 1.0

600/1000

2.5

0.5

600-1000

580

 1320

 1365

 3465

 25.0

1.0

500/1000

1.5

0.5

 500-1000

450

1110

 1155

1525

17.0

 0.5

600/1200

1.5

0.5

600-1200

580

1320

1365

2475

25.0

0.5

 800/1400

1.5

0.5

 800-1400

785

1810

1855

3125

41.0

0.5

1400/1700

0.5

0.2

1400-1700

1350

1900

 2150

8700

55.0

 0.2

1700/2000

0.5

0.2

 1700-2000

1620

1900

2300

9000

59.0

0.2

Additional information

WeightN/A
DimensionsN/A
For more information download the MGF Vetter Blank Pipe Stopper file
mgf download arrow Vetter Blank Pipe Stopper Download Now

How can MGF Support your project?

Call now and speak to one of our team

01942 402 700


MGF Employees Deliver Virtual Training Sessions For Students


For the past 5 years MGF have delivered a training module on excavation which focuses on temporary works, this has historically been delivered in person at The College of East Anglia, however this year Anglian Water has extended the initiative into three additional colleges from across the region exposing up to 60 students to the module. The excavation module forms part of the Construction – Level 2 (Extended Certificate) qualification and is taken by a wide variety of students looking ...

On: 4 Aug, 2020 By: MGF

Coronavirus (COVID-19) Response Statement


The health and wellbeing of our employees, customers, suppliers and the general public continues to be our highest priority.



Adopting a responsible approach, we are now increasing our operational presence as the construction industry continues to resume to higher levels of activity. The distribution of our products and services is running smoothly across our network of depots to ensure our customers are provided with safe working environments with our usual level of service. We have worked ...

On: 1 Jul, 2020 By: MGF

Mickey rallies to support the local community (NHS Volunteer Responders)










Our very own Fleet Manager, Michael (Mickey) Ashcroft recently signed up to the NHS Volunteer Responder scheme along with a phenomenal 600,000 other people from across the UK to support the NHS and their local communities.



Mickey, who lives in Leigh and is still working full-time supporting the business is now a Community Responder Volunteer. He signed up to the scheme as he wanted to support the most ...

On: 7 May, 2020 By: MGF

Video: How do you implement construction site closures with temporary works?


How do you implement construction site closures with temporary works?



In this video, Marketing Manager, Stephen Baldwin interviews Steve Hesketh, MGF Director and member of the board on the Temporary Works Forum (TWf) discussing the considerations and recommendations published within the TWf Information Sheet 11.



An insightful interview for anyone who is currently dealing with site closures.












On: 24 Apr, 2020 By: MGF

Register for Updates

Register your email address now to receive updates on all MGF products.

The GRiPSHORE™ Vertishore rails from MGF allowed us to achieve a comprehensive temporary works design that met with the specific site requirements, whilst also reducing manual handling risks, speeding up installation times & reducing the cost of the temporary works equipment

- James West, Project Manager, R&M Utility and Civil Engineering

Accreditations

Blue and gold RoSPA award logo on white background
White background with blue RISQS logo
Blue RISQS audit logo on white background
CE-mark
Constructionline
ISOQAR
UVDB-AUDITED
UVDB-QUALIFIED
TWF
HSE-strategy
Rail-Alliance-Member-Logo
CPA
LEEA certification logo
Logo for SCSS

By continuing to use the site, you agree to the use of cookies. more information

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close