GRP Ladders

Incredibly lightweight one piece leaning rung ladders, manufactured from E17 Structural Grade Pultruded GRP to BS EN 13706 available in lengths ranging from 3.0m to 7.0m and comply with BS EN 131 to 150kg SWL. All ladders are supplied with 0.40m wide, square, anti-slip rungs and rubber anti-slip end caps on the ends of the stiles as standard.

  • Electrically non-conductive and fire retardant to ASTM E84 Class 1

Technical Specification

Description (m) Weight (kg)
3.0 11
4.0 14
5.0 18
6.0 22
7.0 25
For more information download the MGF GRiPSHORE Technical File
Download Now

How can MGF Support your project?

Call now and speak to one of our team

01942 402 700


Specialist Project: Struts Used to Install 540t Gantry Cranes

As part of the development of their facilities in North East of England, Smulders Projects, who produce offshore wind farm jacket foundations, planned to install two gantry cranes capable of lifting 540t each.
Specialist contractor, ALE Heavylift, was awarded the mammoth tasks of moving the gantry cranes into position, using their own self-propelled modular trailers (SPMTs). ALE required 2 No. 32.27m 1000 series props as a contingency measure to ensure the SPMTs positions were maintained during transport. After spotting MGF’s ...

On: 9 Nov, 2018 By: MGF

New Culvert Puller Rated 10/10

“The set up was quick and simple, a team from MGF came out to site to show us how to use it however the operating instructions and system itself were very straight forward.”
Two new versions of Culvert Pullers have been added to the national fleet and are now available for hire. A Safe System of Work animation has been produced to demonstrate the step-by-step method, available to view on the MGF Youtube channel. The new units are quicker and ...

On: 10 Oct, 2018 By: MGF

North West Depot Open Day

An open day hosted at the North West – Astley Depot celebrated the improvements made at MGF’s first operational yard. Customers and colleagues explored the new facilities and enjoyed food, cake and football darts to mark the milestone occasion.
Every week the Astley Depot processes over 100 deliveries and collections and facilitates 600-800 tonnes of kit, making it MGF’s busiest depot in the country.
Brendan O’Hara, Commercial Director said, “I’m delighted to reveal the developments that have been made as ...

On: 28 Sep, 2018 By: MGF

Help from the industry for the industry

Thousands of construction workers are killed, injured or have their health damaged every year in the UK due to unsafe work practices. MGF first joined the Working Well Together (WWT) construction industry health and safety initiative in 2012 and continue to support it today and help stop this suffering.
The Working Well Together (WWT) campaign was set up in 1998 by the Construction Industry Advisory Committee (CONIAC) after recognising the construction industry itself needed to do more to improve its ...

On: 14 Sep, 2018 By: MGF

Register for Updates

Register your email address now to receive updates on all MGF products.

New technology to de-risk a common high-risk process, using a 3D printer to create models of equipment for training before work moves on to site is a strong advantage.

- Award Panel , Ground Engineering Awards 2014

Accreditations

By continuing to use the site, you agree to the use of cookies. more information

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close