Vetter Multi Test Stopper

The Aluminium Multi Test Stopper is designed for use when air testing drainage pipes to a standard air test of 100mm of water over air. The Aluminium Multi Test Stoppers are very light and easily transported, making them ideal for testing awkward to reach locations. It’s first of a kind aluminium core means that it is now durable to the environment in which it is used, further increasing the lifespan of the product. Inflation is via a hand pump or compressor adapter fitted with a pressure regulator.

KEY PRODUCT FEATURES

  • Highly versatile and durable pipe stopper.
  • Rapid and reliable pipe sealing and testing.
  • Designed for standard air test of 100mm of water over air.
  • Maximum inflation pressure must not be exceeded.

Technical Specification

Range

(mm)

Max Inflation Pressure

(bar)

Working Diameter

(mm)

Length

(mm)

Weight

(kg)

Inside Pipeline

Outside Pipeline

Min

 Max

300 / 400

 1.5

 0.5

300

400

250

7

400 / 500

 1.5

 0.5

400

500

250

9.5

500 / 600

1.5

 0.5

500

600

250

12

600 / 700

 1.5

 0.5

 600

700

250

14.5

700 / 800

 1.5

 0.5

 700

800

250

 17.6

800 / 900

1.5

 0.5

 800

900

250

20.4

900 / 1050

1.5

 0.5

 900

1050

250

23.9

How can MGF Support your project?

Call now and speak to one of our team

01942 402 700


MGF Score 100% in Achilles Audit

MGF are delighted to announce that for the fourth consecutive year, we have achieved 100% in all categories of the Achilles Verify Audit.
The UVDB Verify Audit provides high level, pre-qualification assurance for buyers in the utility sector to assess supply chains before the tender process. It demonstrates a company’s capabilities, credibility and recognition in the marketplace – a ‘passport to trade’ within the sector.
Management Systems Coordinator, Niall Rooney, commented:
“Congratulations and thanks to all involved in continually ...

On: 25 Jan, 2019 By: MGF

Top Service for 650 House-Build Development

One of the largest new housing developments in Crewe prepared for the construction of the storm water wet well, penstock chamber and associated pipework, requiring a trusted supplier for the temporary works.
The developers’ site required a 11m x 7.6m excavation to a depth of 9m to provide a safe working environment to facilitate the construction of the permanent works.
Despite being up against a competitor, MGF were the preferred supplier for McPhillips and secured the work based on quality ...

On: 9 Jan, 2019 By: MGF

5 Design Engineers Achieve EngTech MICE

Congratulations to five members of our Engineering Department who have passed their Professional Technician Review.
Adrian Brown, Charlie Stockley, Chris Atherton, Marcin Dardzinski and Matthew Howarth passed the final stage of qualifications to receive their EngTech status with the Engineering council and MICE accreditations from the Institution of Civil Engineers (ICE), therefore gaining the letters EngTech MICE after their names.
Achieving EngTech status with the ICE proves the ability of the candidate at applying proven engineering techniques and procedures to ...

On: 20 Dec, 2018 By: MGF

MGF Achieve GOLD with the Supply Chain Sustainability School

We are delighted to announce that MGF have achieved Gold membership status with the Supply Chain Sustainability School (SCSS).
SCSS aim to lead the construction industry into a more sustainable future through training, events and collaboration between major contractors and suppliers. Their vision is to deliver “world class collaboration, enabling a sustainable built environment” through their values of being “collaborative, progressive, inspirational and inclusive”.
MGF first joined the school in 2012 with the aim of further understanding our industry’s challenges ...

On: 19 Dec, 2018 By: MGF

Register for Updates

Register your email address now to receive updates on all MGF products.

The GRiPSHORE™ Vertishore rails from MGF allowed us to achieve a comprehensive temporary works design that met with the specific site requirements, whilst also reducing manual handling risks, speeding up installation times & reducing the cost of the temporary works equipment

- James West, Project Manager, R&M Utility and Civil Engineering

Accreditations

By continuing to use the site, you agree to the use of cookies. more information

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close