Drag Boxes

MGF manufacture and supply seven sizes of drag box to suit a wide variety of trench depths and pipe lengths.  Drag Boxes provide a fast and effective method of pipelaying in stable ground conditions where they act as a shield in the event of trench wall instability.

Installation of the Drag Box is achieved by placing the box in a pre-dug trench. The trench is then progressed by excavating ahead of the box and dragging the box forward by pulling on the front strut. As a general guide to the selection of a suitable excavator, the weight of the excavator should be at least 5 times the weight of the drag box.
Drag Box Properties
Drag Boxes Length
(m)
Width
(m)
Minimum Internal
Trench Width(m)
Maximum Internal
Trench Width(m)
Max Clearance
between struts(mm)
Max Clearance
below bottom
strut** (mm)
Max Weight*
(kg)
3.25 x 1.5 3.3 1.5 0.65 4.95 2530 760 1370
4.0 x 2.0 4.0 2.0 0.65 4.95 2970 1150 1750
5.0 x 1.8 5.0 1.8 0.65 4.95 4220 1072 2620
5.0 x 2.4 5.0 2.4 0.65 4.95 4190 1372 3310
5.0 x 3.25 5.0 3.3 0.65 4.95 4220 2258 4170
7.5 x 2.0 7.5 2.0 0.65 4.95 6620 1496 4930
7.5 x 2.4 7.5 2.4 0.65 4.95 6620 1500 4955
* Maximum weight based on 2.0m long strut
** Based on rear struts