  • A lightweight, modular shoring solution for excavations up to 2000mm deep with widths from 650mm to 2000mm, when combined with strut extensions.
  • GRP Modular Box panels create a working area 1500mm wide and a minimum under strut clearance of 570mm to allow services to pass.
  • Created from 2 boxes, each 1000mm deep so that assembled panels can be individually installed by hand.
  • Due to the soil arch created by the hydraulic struts, GRP Modular Boxes can be set out with a clear space of up to 1500mm between boxes making an efficient solution for longer trench runs.
  • Designed to withstand a maximum safe working load of 16.5kN/m2.
  • For use in made ground such as soft cohesive and loose granular fill which is generally self-supporting in the short term and where no water ground is present.
  • Use in problematic ground such as very soft clays and silt or peat or in excavations where a high volume of services are expected to cross the trench is not recommended.
  • The lightweight equipment can be rapidly assembled by hand where access is limited, without the need for an excavator.
  • The hydraulic struts allow the full process to be achieved safely without the requirement for operatives to enter an unsupported trench.

Modular Trench Box 300x300 GRiPSHORE GRP Modular Trench Box

View our GRiPSHORE Modular Trench Box installation guide

Watch our GRiPSHORE video

For more information download the MGF GRiPSHORE Systems  Technical File
mgf download arrow GRiPSHORE GRP Modular Trench BoxDownload Now

How can MGF Support your project?

Call now and speak to one of our team

01942 402 700

Register for Updates

Register your email address now to receive updates on all MGF products.

In addition to the shoring equipment, MGF provided a dedicated Project Manager and Temporary Works Engineer to support the project. Regular contact and consultation combined with their knowledge, experience and understanding of our requirements, and the site, enabled us to safely deliver the shoring elements of a demanding project