Project: Bespoke Modular Propping System for London Basement

Customer: Cantillon

Main Contractor: MACE Group

New Fetter Lane web  thumb Case Study   New Fetter Lane Basement

The 12 -14 New Fetter Lane Project was MGF’s first scheme to be designed using Eurocode 3 (EC3).

The modular propping system was used to support the bulk excavation of the 60m wide and 50m deep basement in central London, the challenge was due to the unusual excavation shape and the design criteria that complicated the build up to then move the props to site.

Each of the 10 props used were a mix of sizes, the shortest measuring just 5.5m while the longest was 27m. The mix of MGF 400 and 600 series hydraulic props were fixed into place over the course of a week, delivered ‘just in time’ getting the right prop in place at exactly the right time to avoid causing a congestion challenge.

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close